Waste Management
Plan for Tung Chung New Town Extension (East)
(EP No.
EP-519/2016)
September 2026
_files/image005.jpg)
_files/image006.jpg)
History of Revision and Amendments
|
Revision Number |
Date of Report |
Amendments |
|
1 |
May 2018 |
First Submission |
|
2 |
March 2023 |
Second Submission |
|
3 |
September 2026 |
Third Submission |
Table of Contents
Contents
1.2.4. Tung Chung New Town Extension – Tai Ho Interchange (Contract No. NL/2020/07) (Contract 7)
Annex 4 - Tung Chung New
Town Extension – Tai Ho Interchange (Contract No. NL/2020/07) (Contract 7)
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.
Introduction
1.1.
Background
The Environmental Impact Assessment (EIA) Report
(Register No.: AEIAR-196/2016) prepared for the “Tung Chung New Town Extension”
(hereinafter referred to as “the Project”) has been approved by the Director of
Environmental Protection, and an Environmental Permit (EP) (Permit No.:
EP-519/2016) has been issued for the project under the Environmental Impact
Assessment Ordinance. This submission of Waste Management Plan has been
prepared in accordance with Condition 2.24 of the EP and includes at least the
following information:
(i)
arrangements for avoidance, minimization, recovery, recycling, reuse, storage, collection,
treatment and disposal of different categories of waste to be generated from
the construction activities;
(ii)
the recommended mitigation measures on waste management contained in the
approved EIA report (Register No. AEIAR-196/2016);
(iii)
maximization of the use of C&D materials for the land formation work during
the construction phase of the Project;
(iv)
critical review of the scheduling of the surcharge operations to avoid, or
otherwise, minimize generation of residual C&D materials requiring disposal
during and at the end of the land formation work;
(v)
designated disposal location(s) for all surplus excavated spoil and other
wastes;
(vi)
all dump trucks engaged on site to be equipped with GPS or equivalent automatic
system for real time tracking and monitoring of their travel routings and
parking locations to prohibit illegal dumping and landfilling of C&D
materials;
(vii)
proposals for record and analysis of data collected by GPS or equivalent automatic
system relating to travel routings and parking locations of dump trucks engaged
on site;
(viii)
reporting of illegal dumping and landfilling of C&D materials outside the
designated disposal locations by the Surveillance Team appointed under
Condition 2.6; and
(ix) follow-up
actions to be taken by the Contractor and dump truck drivers for committing
suspected offences relating to illegal dumping and landfilling of C&D materials..
The development of
Tung Chung New Town Extension (TCNTE), comprising Tung Chung East (TCE) and
Tung Chung West (TCW), is a mega-scale and complex project aiming to provide
land to meet the future housing economic and social development needs of Hong
Kong. Due to the fact that the proposed works
are geographically separated, the implementation of mega-scale Project is
divided into two packages, namely TCE and TCW respectively. In accordance with
the tight delivery programme, the Project will be implemented in phases under separate
contracts for the developments of TCE and TCW. This submission only covers the
Waste Management Plan for TCE. The WMP for TCW can be found at the dedicated
project website: https://www.env.tcnte-west.hk/en/ep-submissions.html.
1.2.
Scope of Works
1.2.1. Tung Chung New Town Extension – Reclamation and
Advance Works (Contract No. NL/2017/03) (Contract 1)
Build King – SCT
Joint Venture (BKSCTJV) is the contractor appointed to undertake the
reclamation works in Tung Chung East and the advance works for the Project. The
works mainly comprise:-
1.2.2. Tung Chung New Town Extension – Salt
Water Supply System (Contract No. NL/2020/02) (Contract 2)
China
Geo-engineering Corporation (CGC) is the contractor appointed to undertake the construction
of salt water supply system for the Project. The
works mainly comprise:-
1.2.3. Tung Chung New Town Extension – Major Infrastructure
Works in Tung Chung East (Contract No. NL/2020/03) (Contract 3)
Build King Civil
Engineering Limited (BKCEL) is the contractor appointed to undertake the construction
of main infrastructure works for the Project. The works mainly comprise:-
1.2.4. Tung Chung New Town Extension – Tai Ho Interchange
(Contract No. NL/2020/07) (Contract 7)
Build King Civil
Engineering Limited (BKCEL) is the contractor appointed to undertake the
construction of Tai Ho Interchange connecting North Lantau Highway, Road P1 and
Cheung Tung Road, construction of a section of dual two-lane Road P1 between
Tung Chung East and Tai Ho Interchange, laying of fresh water, salt water and
sewage rising mains, associated civil, geotechnical and landscaping works for
the Project. The works mainly comprise:-
1.2.5. Tung
Chung New Town Extension – Remaining Infrastructure Works in Tung Chung East
(Contract No.NL/2026/08) (Contract 8)
Sang
Hing - Tapbo Joint Venture (STJV) is the contractor
appointed to undertake the construction of remaining infrastructure works. The works mainly comprise: